2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material (Pack of 24)
2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material (Pack of 24)
SKU: SKU: 2589800000 Download PDF
- 2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material (Pack of 24)
- 2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material (Pack of 24)
- 1-1-1-3 ALUMINUM SER CABLE
- 1/0-1/0-1/0-2 ALUMINUM SER CABLE
- 9015980000 - Cable Gland Tool for 24-36mm Sizes, 30mm Deep
- 2-2-4 Stephens Triplex Aluminum Conductor Underground Direct Burial 600V URD Cable
- Belden 7837A 22 AWG 1 Pair Solid Tinned Copper 300V T1/DS1 Central Office Cable
- Belden 29725C 6 AWG 3 Conductor 7x14 Stranding Bare Copper 2000V Variable Frequency Drives Cable
- Belden 29724C 8 AWG 3 Conductor 7x16 Stranding Bare Copper 2000V Variable Frequency Drives Cable
- Belden 29723C 10 AWG 3 Conductor 7x18 Stranding Bare Copper 2000V Variable Frequency Drives Cable
- Belden 29721C 14 AWG 3 Conductor 7x22 Stranding Bare Copper 2000V Variable Frequency Drives Cable
- Belden 29722C 12 AWG 3 Conductor 7x20 Stranding Bare Copper 2000V Variable Frequency Drives Cable
- Belden 29537 12 AWG 3 Conductor 65x30 Stranding Tinned Copper 1000V Variable Frequency Drives Cable
- Belden YC45952 16 AWG 2 Conductor 7x24 Stranding Tinned Copper Multi-Conductor Cable
- Belden YC45951 16 AWG 1 Pair 2 Conductor 7x24 Stranding Tinned Copper 600V Multi-Conductor Cable
- Belden A02142R 14 AWG 2 Conductor 7x22 Stranding Bare Copper 600V Type TC Cable
- Belden 28335AS 18 AWG 5 Conductor 7x26 Stranding Bare Copper 600V Type TC Cable
- Belden 7808WB 15 AWG 1 Conductor Solid Bare Copper 300V Wireless Transmission Coax Cable Cable
- Belden 6545FE 22 AWG 6 Pair 7x30 Stranding Bare Copper 300V Security and Sound Cable
- Belden 28110A 12 AWG 3 Conductor 7x20 Stranding Bare Copper 600V Type TC Cable
- Belden 6501FH 22 AWG 3 Conductor 7x30 Stranding Tinned Copper 300V Security and Sound Cable
- Belden 1382LP 16 AWG 2 Conductor Solid Bare Copper 300V Multi-Conductor Cable
- Belden 1386LP 22 AWG 1 Pair 18 AWG 1 Conductor 12 AWG 2 Conductor Bare Copper 300V Multi-Conductor Cable
- Belden 1613AT 18 AWG 1 Conductor Solid Bare Copper Covered Steel 300V CATV Video Coax Cable
- Belden 1839AC 18 AWG 1 Conductor Solid Bare Copper 300V DBS Coax Cable
- Belden 1316SB 12 AWG 1 Pair 65x30 Stranding Tinned Copper 300V Shipboard Speaker Cable
- Belden 1278R 25 AWG 4 Conductor Solid Tinned Copper 300V RGB Video Coax Cable
- Belden 1277R 25 AWG 3 Conductor Solid Tinned Copper 300V RGB Video Coax Cable
- Belden 1263B 25 AWG 2 Conductor 7x33 Stranding Bare Copper 150V Composite Coax Cable
- Belden 1521A 30 AWG 4 Conductor 7x38 Stranding Tinned Copper 300V RGB Video Coax Cable
- Belden 9262 22 AWG 1 Conductor 7x30 Stranding Tinned Copper 300V Composite Audio Coax Cable
- Belden 9171 22 AWG 2 Conductor 7x30 Stranding Bare Copper 300V Coax Cable
- Belden 9167 20 AWG 1 Conductor Solid Silver Plated Copper Covered Steel 300V Coax Cable
- Belden 668AMD 24 AWG 7x32 Stranding 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding 300V Dual OSDP Access Control Cable
- Belden 6641FD 24 AWG 2 Pair 7x32 Stranding Tinned Copper 300V OSDP Reader Cable
- Belden 658JMS 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding 300V OSDP Access Control Cable
- Belden 658HMS 24 AWG 7x32 Stranding 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding 300V OSDP Access Control Cable
- Belden 658AMS 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding Bare Copper 300V Access Control Cable
- Belden 658AMJ 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding Bare Copper 300V Access Control Cable
- Belden 6541FD 22 AWG 2 Pair 7x30 Stranding Tinned Copper 300V OSDP Reader Cable
- Belden 6540FD 22 AWG 1 Pair 7x30 Stranding Tinned Copper 300V OSDP Reader Cable
- Belden 6408MD 22 AWG 1 Pair Tinned Copper 20 AWG 8 Conductor Bare Copper 300V OSDP Access Control Cable
- Belden 638JMDS 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding 16 AWG 19x27 Stranding 300V OSDP Access Control Cable
- Belden 638AMS 18 AWG 7x26 Stranding 16 AWG 19x29 Stranding Bare Copper 300V Access Control Cable
- Belden 6386MD 22 AWG 2 Pair Tinned Copper 18 AWG 4 Conductor Bare Copper 300V Dual OSDP Access Control Cable
- Belden 6381MD 24 AWG 1 Pair Tinned Copper 18 AWG 2 Pair Bare Copper 300V OSDP Reader Cable
- Belden 558GMS 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding Bare Copper 300V Access Control Cable
- Belden 558ANH 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding Bare Copper 300V Access Control Cable
- Belden 558AMS 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding Bare Copper 300V Access Control Cable
- Belden 558AMJ 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding Bare Copper 300V Access Control Cable
- Belden 558AM1 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding Bare Copper 300V Access Control Cable
- Belden 558ALY 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding 300V Access Control Cable
- Belden 538HMD1 22 AWG 7x30 Stranding 18 AWG 7x26 Stranding 300V OSDP Access Control Cable
- Belden 538AMS 18 AWG 7x26 Stranding 16 AWG 19x29 Stranding Bare Copper 300V Access Control Cable
- Belden 538AMJ 18 AWG 7x26 Stranding 16 AWG 19x29 Stranding Bare Copper 300V Access Control Cable
- Belden 538AFJ 18 AWG 7x26 Stranding 16 AWG 19x29 Stranding Bare Copper 300V Access Control Cable
- Belden 5381M1 22 AWG 1 Pair 18 AWG 2 Conductor 300V OSDP Reader Cable
- Belden 3104A 12 AWG 3 Conductor 7x20 Stranding Bare Copper 600V Tray and TC Cable
- Belden 1032AE 18 AWG 1 Pair 7x26 Stranding Bare Copper 300V Instrumentation PLTC Cable
- Belden 1030AE 16 AWG 1 Pair 7x24.5 Stranding Bare Copper 300V Instrumentation PLTC Cable
- Belden 77804WS 18 AWG 4 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77807WS 18 AWG 7 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77805WS 18 AWG 5 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77803WS 18 AWG 3 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77604WS 16 AWG 4 Conductor 168x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77603WS 16 AWG 3 Conductor 168x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77404WS 14 AWG 4 Conductor 266x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77004WS 20 AWG 4 Conductor 63x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 73812WS 18 AWG 12 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73807WS 18 AWG 7 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73805WS 18 AWG 5 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73804WS 18 AWG 4 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73803WS 18 AWG 3 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73607WS 16 AWG 7 Conductor 26x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73605WS 16 AWG 5 Conductor 26x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73604WS 16 AWG 4 Conductor 26x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73407WS 14 AWG 7 Conductor 41x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73405WS 14 AWG 5 Conductor 41x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73404WS 14 AWG 4 Conductor 41x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73403WS 14 AWG 3 Conductor 41x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73205WS 12 AWG 5 Conductor 65x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73204WS 12 AWG 4 Conductor 65x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73203WS 12 AWG 3 Conductor 65x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73012WS 20 AWG 12 Conductor 10x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 73007WS 20 AWG 7 Conductor 10x30 Stranding Bare Coppe 600V MachFlex Cable
- Belden 77812WS 18 AWG 12 Conductor 105x38 Stranding Bare Coppe 600V MachFlex Cable
- Belden 76318WS 22 AWG 18 Conductor 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76312WS 22 AWG 12 Conductor 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76307WS 22 AWG 7 Conductor 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76305WS 22 AWG 5 Conductor 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76304WS 22 AWG 4 Conductor 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76303WS 22 AWG 3 Conductor 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76302WS 22 AWG 2 Conductor 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76225WS 24 AWG 25 Conductor 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76218WS 24 AWG 18 Conductor 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Corning 012EUF-T8101DYL 12 Fiber Riser Commercial OS1 Freedm Loose Tube Gel Free Yellow Cable
- Belden 76207WS 24 AWG 7 Conductor 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76205WS 24 AWG 5 Conductor 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76204WS 24 AWG 4 Conductor 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76203WS 24 AWG 3 Conductor 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76202WS 24 AWG 2 Conductor 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76125WS 26 AWG 25 Conductor 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76118WS 26 AWG 18 Conductor 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76112WS 26 AWG 12 Conductor 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76107WS 26 AWG 7 Conductor 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76105WS 26 AWG 5 Conductor 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76103WS 26 AWG 3 Conductor 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76102WS 26 AWG 2 Conductor 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76025WS 28 AWG 25 Conductor 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76018WS 28 AWG 18 Conductor 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76012WS 28 AWG 12 Conductor 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76005WS 28 AWG 5 Conductor 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76002WS 28 AWG 2 Conductor 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76714TS 22 AWG 14 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76710TS 22 AWG 10 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76708TS 22 AWG 8 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76706TS 22 AWG 6 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76705TS 22 AWG 5 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76704TS 22 AWG 4 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76703TS 22 AWG 3 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76702TS 22 AWG 2 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76701TS 22 AWG 1 Pair 19x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76610TS 24 AWG 10 Pair 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76608TS 24 AWG 8 Pair 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76606TS 24 AWG 6 Pair 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76605TS 24 AWG 5 Pair 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76604TS 24 AWG 4 Pair 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76603TS 24 AWG 3 Pair 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76602TS 24 AWG 2 Pair 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76601TS 24 AWG 1 Pair 10x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76514TS 26 AWG 14 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76510TS 26 AWG 10 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76508TS 26 AWG 8 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76506TS 26 AWG 6 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76505TS 26 AWG 5 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76504TS 26 AWG 4 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76503TS 26 AWG 3 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76502TS 26 AWG 2 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76501TS 26 AWG 1 Pair 7x34 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76408TS 28 AWG 8 Pair 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76406TS 28 AWG 6 Pair 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76405TS 28 AWG 5 Pair 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76404TS 28 AWG 4 Pair 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76403TS 28 AWG 3 Pair 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76402TS 28 AWG 2 Pair 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 76401TS 28 AWG 1 Pair 7x36 Stranding Tinned Copper 300V MachFlex Cable
- Belden 77812W 18 AWG 12 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77807W 18 AWG 7 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77805W 18 AWG 5 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77804W 18 AWG 4 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77803W 18 AWG 3 Conductor 105x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77607W 16 AWG 7 Conductor 168x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77605W 16 AWG 5 Conductor 168x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77604W 16 AWG 4 Conductor 168x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77603W 16 AWG 3 Conductor 168x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77407W 14 AWG 7 Conductor 266x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77404W 14 AWG 4 Conductor 266x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77007W 20 AWG 7 Conductor 63x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77005W 20 AWG 5 Conductor 63x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77004W 20 AWG 4 Conductor 63x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 77003W 20 AWG 3 Conductor 63x38 Stranding Bare Copper 600V MachFlex Cable
- Belden 73812W 18 AWG 12 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73809W 18 AWG 9 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73807W 18 AWG 7 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73805W 18 AWG 5 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73804W 18 AWG 4 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73803W 18 AWG 3 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73802W 18 AWG 2 Conductor 16x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73612W 16 AWG 12 Conductor 26x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73609W 16 AWG 9 Conductor 26x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73607W 16 AWG 7 Conductor 26x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73605W 16 AWG 5 Conductor 26x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73604W 16 AWG 4 Conductor 26x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73603W 16 AWG 3 Conductor 26x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73602W 16 AWG 2 Conductor 26x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73409W 14 AWG 9 Conductor 41x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73407W 14 AWG 7 Conductor 41x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73405W 14 AWG 5 Conductor 41x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73404W 14 AWG 4 Conductor 41x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73403W 14 AWG 3 Conductor 41x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73402W 14 AWG 2 Conductor 41x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73205W 12 AWG 5 Conductor 65x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73204W 12 AWG 4 Conductor 65x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73203W 12 AWG 3 Conductor 65x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73012W 20 AWG 12 Conductor 10x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73009W 20 AWG 9 Conductor 10x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73007W 20 AWG 6 Conductor 10x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73005W 20 AWG 5 Conductor 10x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73004W 20 AWG 4 Conductor 10x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73003W 20 AWG 3 Conductor 10x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 73002W 20 AWG 2 Conductor 10x30 Stranding Bare Copper 600V MachFlex Cable
- Belden 7504A 16 AWG 1 Conductor 7x37x40 Stranding Bare Copper 75 Ohm MachFlex Cable
- Belden 7501A 25 AWG 1 Conductor 19x38 Stranding Bare Copper 75 Ohm MachFlex Cable
- Belden 7500A 30 AWG 1 Conductor 7x38 Stranding Tinned Copper Alloy 75 Ohm MachFlex Cable
- Belden 3108DB 22 AWG 3 Pair 7x30 Stranding Tinned Copper 300V RS-485 Cable
- 24 AWG 2 Pair Type CMR Foil Shield Computer Cable
- 22 AWG 3 Pair Type CMG Foil/Braid Shield Computer Cable
- Belden 127953A 23 AWG 4 Pair Solid Bare Copper Category 6 300V DataTuff Cable
- Belden 127925R 23 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6 300V DataTuff Cable
- Belden SPE404 22 AWG 1 Pair Stranded Tinned Copper 300V DataTuff Cable
- Belden SPE402 26 AWG 1 Pair Solid Bare Copper 300V DataTuff Cable
- Belden SPE102 22 AWG 1 Pair Stranded Tinned Copper 300V DataTuff Cable
- Belden SPE101 18 AWG 1 Pair Solid Tinned Copper 300V DataTuff Cable
- Belden 7970A 22 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6 600V DataTuff Cable
- Belden 7953T 23 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6 300V MarineTuff Cable
- Belden 7945A 23 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6 300V DataTuff Cable
- Belden 7901A 24 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 5e 300V DataTuff Cable
- Belden OSP6AF 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden IOP6AU 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden IOP6AF 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden IEA007 22 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6A 600V DataTuff Cable
- Belden IEA006 22 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6A 600V DataTuff Cable
- Belden IEA005 26 AWG 4 Pair 7x34 Stranding Tinned Copper Industrial Ethernet Cat 6A 600V DataTuff Cable
- Belden IEA004 24 AWG 4 Pair 7x32 Stranding Tinned Copper Industrial Ethernet Cat 6A 600V DataTuff Cable
- Belden IEA002 23 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6A 300V DataTuff Cable
- Belden DOSP6AU 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden DOSP6AF 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden DAUR 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden DAUP 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden DAFR 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 500MHz Horizontal Cable
- Belden DAFP 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden 10GXW53 23 AWG 4 Pair Solid Bare Copper Category 6A Enhanced Premise 300V Horizontal Cable
- Belden 10GXW52 23 AWG 4 Pair Solid Bare Copper Category 6A Enhanced Premise 300V Horizontal Cable
- Belden 10GXW13 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden 10GXW12 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden 10GXM13 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden 10GXE02 23 AWG 4 Pair Solid Bare Copper Category 6A Enhanced Premise 625MHz Horizontal Cable
- Belden 2147A 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden 2142A 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden 2141A 23 AWG 4 Pair Solid Bare Copper Category 6A Premise 300V Horizontal Cable
- Belden 777940T 23 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6 MarineTuff Cable
- Belden DOSP6U 23 AWG 4 Pair Solid Bare Copper Category 6 Premise 300V Horizontal Cable
- Belden DOSP6F 23 AWG 4 Pair Solid Bare Copper Category 6 Premise 300V Horizontal Cable
- Belden XCGB4 23 AWG 4 Pair Solid Bare Copper Category 6 Premise 250MHz Cross Connect Cable
- Belden IOP6U 23 AWG 4 Pair Solid Bare Copper Category 6 Premise 300V Horizontal Cable
- Belden IOP6F 23 AWG 4 Pair Solid Bare Copper Category 6 Premise 300V Horizontal Cable
- Belden D6UR 23 AWG 4 Pair Solid Bare Copper Category 6 Premise 300V Horizontal Cable
- Belden D6UP 23 AWG 4 Pair Solid Bare Copper Category 6 Premise 300V Horizontal Cable
- Belden 7971A 22 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6 600V DataTuff Cable
- Belden 7969A 22 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 6 600V DataTuff Cable
- Belden 2140A 23 AWG 4 Pair Solid Bare Copper Category 6 Premise 300V Horizontal Cable
- Belden 2433 23 AWG 4 Pair Solid Bare Copper Category 6 Enhanced Premise 300V Horizontal Cable
- Belden 2424 23 AWG 4 Pair Solid Bare Copper Category 6 Enhanced Premise 300V Horizontal Cable
- Belden 1583ANH 24 AWG 4 Pair Solid Bare Copper Category 5e Premise 300V Horizontal Cable
- Belden 127929A 24 AWG 4 Pair Solid Bare Copper Industrial Ethernet Cat 5e 300V DataTuff Cable
- Belden 1224 24 AWG 4 Pair Solid Bare Copper Category 5e Premise 300V Horizontal Cable
- Belden RIPDOU 22 AWG 4 Pair Solid Bare Copper 300V RemoteIP Cable
- Belden RIPRXU 22 AWG 4 Pair Solid Bare Copper 300V RemoteIP Cable
- Belden RIPRU 22 AWG 4 Pair Solid Bare Copper 300V RemoteIP Cable
- Belden RIPPU 22 AWG 4 Pair Solid Bare Copper 300V RemoteIP Cable
- Belden 973105Z 22 AWG 1 Pair 7x30 Stranding Tinned Copper 300V RS-485 Cable
- Belden 3109DB 22 AWG 4 Pair 7x30 Stranding Tinned Copper 300V RS-485 Cable
Couldn't load pickup availability

*Data provided on this page is subject to change based on different manufacturers' variances
** Images are for display purposes only refer to Product Technical Details for accurate information on the product.
In the case the material only comes in a predetermined color or doesn’t come with any color
Description:
Optimize your space with this cable duct floor duct, designed for efficiency and practicality Measuring 60 mm in height and 80 mm in width, this duct spans a length of 2000 mm Crafted from lead-free PVC, it guarantees safety and reliability in your installations Please note that this product will no longer be available after December 31, 2025.
Features and Benefits:
•Compliant with RoHS without exemption.
•Includes a lid and is non-tracking.
•UL 94 flammability rating of V-0.
•Usable cross-section is 4,200 mm².
•Flexible wiring duct is not available.
•Operates within a temperature range of -5 to 60 °C.
Specifications:
| Height | 60 mm |
| Width | 80 mm |
| Length | 2000 mm |
| Height (inches) | 2.362 inch |
| Width (inches) | 3.15 inch |
| Length (inches) | 78.74 inch |
| Basic material | PVC / lead-free |
| Slit gap | 12 mm |
| Slit width | 8 mm |
| Operating temperature range | -5...60 °C |
| Standards | In accordance with DIN EN 50085 |
| Type of mounting | when screwed in, with adhesive, riveted |
| Floor rails | 1 |