{"product_id":"2589800000-pvc-cable-duct-60x80mm-2m-long-lead-free-material-pack-of-24","title":"2589800000 - PVC Cable Duct 60x80mm, 2m Long, Lead-Free Material  (Pack of 24)","description":"\u003cp\u003e\u003cstrong\u003eDescription:\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003eOptimize your space with this cable duct floor duct, designed for efficiency and practicality Measuring 60 mm in height and 80 mm in width, this duct spans a length of 2000 mm Crafted from lead-free PVC, it guarantees safety and reliability in your installations Please note that this product will no longer be available after December 31, 2025.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eFeatures and Benefits:\u003c\/strong\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cp\u003e•Compliant with RoHS without exemption.\u003c\/p\u003e\n\u003cp\u003e•Includes a lid and is non-tracking.\u003c\/p\u003e\n\u003cp\u003e•UL 94 flammability rating of V-0.\u003c\/p\u003e\n\u003cp\u003e•Usable cross-section is 4,200 mm².\u003c\/p\u003e\n\u003cp\u003e•Flexible wiring duct is not available.\u003c\/p\u003e\n\u003cp\u003e•Operates within a temperature range of -5 to 60 °C.\u003c\/p\u003e\n\u003c\/ul\u003e\u003cp\u003e\u003cstrong\u003eSpecifications:\u003c\/strong\u003e\u003c\/p\u003e\u003ctable width=\"100%\" style=\"height: 10px; width: 90.1204%;\"\u003e\n\u003ctbody\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Height\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e60 mm\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Width\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e80 mm\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Length\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e2000 mm\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Height (inches)\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e2.362 inch\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Width (inches)\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e3.15 inch\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Length (inches)\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e78.74 inch\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Basic material\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003ePVC \/ lead-free\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Slit gap\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e12 mm\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Slit width\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e8 mm\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Operating temperature range\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e-5...60 °C\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Standards\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003eIn accordance with DIN EN 50085\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Type of mounting\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003ewhen screwed in, with adhesive, riveted\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003ctbody\u003e\u003ctr style=\"height: 39.2px;\"\u003e\n\u003ctd style=\"height: 39.2px; width: 40.4219%;\"\u003e Floor rails\u003c\/td\u003e\n\u003ctd style=\"width: 59.2209%; height: 39.2px;\"\u003e1\u003c\/td\u003e\n\u003c\/tr\u003e\u003c\/tbody\u003e\n\u003c\/table\u003e\u003cp\u003e \u003c\/p\u003e\u003cp\u003e[pdf]\u003cembed src=\"https:\/\/cdn.shopify.com\/s\/files\/1\/0013\/1117\/8815\/files\/document_177442a4-72b4-439a-a572-99a8c1692e57.pdf?v=1759499416\" width=\"\" height=\"\" type=\"application\/pdf\"\u003e[\/pdf]\u003c\/embed\u003e\u003c\/p\u003e","brand":"AIM ELECTRONICS","offers":[{"title":"Default Title","offer_id":42435230433343,"sku":"2589800000","price":308.67,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0013\/1117\/8815\/files\/download_fb891fa4-0932-46fe-badb-24d7cd99782a.jpg?v=1759499442","url":"https:\/\/nassauelectricalspot.com\/products\/2589800000-pvc-cable-duct-60x80mm-2m-long-lead-free-material-pack-of-24","provider":"NassauElectrical","version":"1.0","type":"link"}